Bridges & Small Structures

Bridge #100 and #101 - Olive Street and Sample Street over Conrail and GTW Railroads


This is a cooperative project with the City of South Bend Department of Public Works and consists of roundabout construction, bridge deck replacement over railroad, sidewalks and street lighting. Construction is currently underway, and should be complete in 2017.
Consulting Engineers: DLZ (Design) and Lawson-Fisher & Associates (Construction)
Contractor: Rieth-Riley Construction

Bridge #7 and #212 - Cleveland Road over St. Joseph River and Juday Creek


Project consists of reconstructing the existing pavement, bridge rehabilitation and deck replacement over St. Joseph River, and multi-use path construction. Engineering design is complete, and construction should begin in 2017.
Consulting Engineers: Lochmueller Group (Design and Construction)
Contractor: TBD

Bridge #62 - Walnut Road over Yellow Bank Creek


Project consists of a complete replacement of existing bridge structure. Engineering design is underway, and projected to be ready for construction in 2018.
Consulting Engineers: CHA (Design) and TBD (Construction)
Contractor: TBD

Bridge #58 - Underwood Road over Pine Creek


Project consists of a complete replacement of existing bridge structure. Engineering design is underway, and projected to be ready for construction in 2018.
Consulting Engineers: Troyer Group (Design) and TBD (Construction)
Contractor: TBD

Bridge #77 - Shively Road over Kline Ditch


Project consists of a complete replacement of existing bridge structure. Engineering design is underway, and projected to be ready for construction in 2017.
Consulting Engineers: 
Troyer Group (Design & Construction)
Contractor: TBD

Bridge #193 - Portage Avenue over abandoned Conrail Railroad


Project consists of a complete replacement of existing bridge structure with a three-sided small structure over the abandoned Conrail railroad, which will eventually be converted to a multi-use path by the City of South Bend. Engineering design is nearing completion, and projected to be ready for construction in 2018.
Consulting Engineers: 
Lawson-Fisher & Associates (Design & Construction)
Contractor: TBD

Bridge #303 - Bendix Drive over Indiana Toll Road (I-80/90)


Project consists of a complete replacement of existing bridge structure. Engineering design is underway, and projected to be ready for construction in 2019.
Consulting Engineers: 
Lochmueller Group (Design & Construction)
Contractor: TBD

Bridge #191 - Douglas Road over Juday Creek & 

Bridge #192 - Ironwood Road over Juday Creek


Project consists of improving the intersection of Douglas Road and Ironwood Road with widening for turn turn lanes and upgrading the existing traffic signal. The project also includes 2 bridge replacements over Juday Creek. There is also potential for complete corridor reconstruction with widening for added travel lanes from Ivy Road to SR 23 for added travel lanes. Preliminary engineering is underway, and projected to be ready for construction in 2020. 
Consulting Engineers: DLZ (Design) and TBD (Construction)
Contractor: TBD

Small Structure #605 - Redwood Road over Potato Creek


Consulting Engineers: DLZ (Design)
Contractor: TBD

Small Structure #575 - Crumstown Trail over Laskowski Ditch


Consulting Engineers: DLZ (Design)
Contractor: TBD

Small Structure #580 - Inwood Road over Niespodziany Ditch


Consulting Engineers: Lochmueller Group (Design)
Contractor: TBD

Small Structure #625 - Strawberry Road over Niespodziany Ditch


Consulting Engineers: Lochmueller Group (Design)
Contractor: TBD